Laurel Wind Energy Center is a 307 MW Wind project in Texas, currently active.
LAUREL ENERGY CENTER, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-12-31.
- Queue ID
- ERCOT-27INR0056
- Location
- Pecos, Texas
- Technology
- Wind
- Developer
- LAUREL ENERGY CENTER, LLC
- Market / region
- ERCOT
- Point of interconnection
- Solstice to Bakersfield (Bus# 60404 -76002) 345kV Ckt 2 line tap
What stands out
Laurel Wind Energy Center is a 307 MW Wind project in Texas with status active.
LAUREL ENERGY CENTER, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2027-12-31.
Latest linked story: “Clearway Begins Repowering of Texas Wind Farm” (POWER Magazine, 2024-07-08).
Market and operating context
- Queue date
- 2023-06-28
- Proposed COD
- 2027-12-31
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.