Briefing on LASSEN LODGE HYDROELECTRIC

Entity Briefing
Generated Oct 14, 2026·Dataset freshness not reported
5 MW
Proposed capacity
active
Current status
Hydro
Technology
CAISO
Market / region
2027-10-15
Proposed COD
C04
Queue phase
Briefing/projectactive

LASSEN LODGE HYDROELECTRIC is a 5 MW Hydro project in California, currently active.

The reported queue phase is C04. Proposed COD is 2027-10-15.

Queue ID
CAISO-720
Location
Tehama, California
Technology
Hydro
Market / region
CAISO
Point of interconnection
Vota-South 60 kV

What stands out

1

LASSEN LODGE HYDROELECTRIC is a 5 MW Hydro project in California with status active.

2

The reported queue phase is C04; proposed COD is 2027-10-15.

Market and operating context

Queue date
2011-03-31
Proposed COD
2027-10-15
IA status
IA Executed
Study phase
C04
Service type
ERIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

LASSEN LODGE HYDROELECTRIC — verified asset snapshot

FieldValue
Queue IDCAISO-720
LocationTehama, California
TechnologyHydro
Market / regionCAISO
Point of interconnectionVota-South 60 kV
Queue date2011-03-31
Proposed COD2027-10-15
IA statusIA Executed