Query
Lannon Stone
Type
Entity Briefing
Entity
Lannon Stone
ISO/RTO
isone
Summary generated
Oct 14, 2026
First saved
Date not recorded

Briefing on Lannon Stone

Entity Briefing

Summary generated Oct 14, 2026 (UTC).

Source dates used by this summary were not recorded.

2 MW
Capacity
Operating
Current status
2021
Operating since
1
Generators
18.5%
Capacity factor
4 GWh
Annual generation
Briefing/plantOperating

Lannon Stone is a 2 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Operating.

Lannon Stone is reported in Wisconsin since 2021 under WEC Energy Group. Available operating and financial measures include 18.5% capacity factor and 4 GWh annual generation; $1633/kW reported CapEx.

Location
Waukesha, Wisconsin
Technology
Solar Photovoltaic
Owner / parent
WEC Energy Group
Operator
Wisconsin Electric Power Co
Grid
MISO (Midcontinent)
Plant ID
67430

What stands out

1

Lannon Stone is a 2 MW Solar Photovoltaic asset in Wisconsin with status Operating.

2

Latest annual operating measures report 18.5% capacity factor and 4 GWh annual generation.

3

Available financial measures include $31.7/MWh OpEx, $1633/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
RFC
State rank
#88 of 132
National rank
#5114 of 7,971

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.