Query
Lakeland Electric Co. (FL) - Airport II
Type
Entity Briefing
Entity
Lakeland Electric Co. (FL) - Airport II
Generated
2026-10-12T06:09:18.043Z

Briefing on Lakeland Electric Co. (FL) - Airport II

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
4 MW
Capacity
Operating
Current status
2012
Operating since
1
Generators
7.2%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

Lakeland Electric Co. (FL) - Airport II is a 4 MW Solar Photovoltaic asset in Florida, currently Operating.

Lakeland Electric Co. (FL) - Airport II is reported in Florida since 2012 under Sun E N7 Holdings LLC. Available operating and financial measures include 7.2% capacity factor and 2 GWh annual generation; $16.6/MWh reported energy value.

Location
Polk, Florida
Technology
Solar Photovoltaic
Owner / parent
Sun E N7 Holdings LLC
Operator
Sun E N7 Holdings LLC
Grid
Tampa Electric Company
Plant ID
59754

What stands out

1

Lakeland Electric Co. (FL) - Airport II is a 4 MW Solar Photovoltaic asset in Florida with status Operating.

2

Latest annual operating measures report 7.2% capacity factor and 2 GWh annual generation.

3

Available financial measures include $16.6/MWh energy value.

Market and operating context

Balancing authority
Tampa Electric Company
NERC region
SERC
State rank
#216 of 237
National rank
#4315 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.