Query
Lafayette 2 - MLK Jr. Hospital (MLK)
Type
Entity Briefing
Entity
Lafayette 2 - MLK Jr. Hospital (MLK)
Summary generated
Oct 18, 2026
First saved
Date not recorded

Briefing on Lafayette 2 - MLK Jr. Hospital (MLK)

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

2 MW
Capacity
Operating
Current status
2020
Operating since
1
Generators
15.3%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

Lafayette 2 - MLK Jr. Hospital (MLK) is a 2 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Lafayette 2 - MLK Jr. Hospital (MLK) is reported in California since 2020 under MN8 Energy LLC. Available operating and financial measures include 15.3% capacity factor and 2 GWh annual generation; $12.4/MWh reported energy value.

Location
Los Angeles, California
Technology
Solar Photovoltaic
Owner / parent
MN8 Energy LLC
Operator
MN8 Energy LLC
Grid
CAISO (California)
Plant ID
63623

What stands out

1

Lafayette 2 - MLK Jr. Hospital (MLK) is a 2 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 15.3% capacity factor and 2 GWh annual generation.

3

Available financial measures include $12.4/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#678 of 992
National rank
#6330 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.