Briefing/projectactive
La Morena Energy Center Solar is a 250 MW Solar project in Texas, currently active.
Adapture Solar Development is the reported developer. Proposed COD is 2029-05-07.
- Queue ID
- ERCOT-30INR0043
- Location
- Zapata, Texas
- Technology
- Solar
- Developer
- Adapture Solar Development
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV (80225) CENIZO7C - (80307) DELSOL7C
What stands out
1
La Morena Energy Center Solar is a 250 MW Solar project in Texas with status active.
2
Adapture Solar Development is the reported developer.
3
proposed COD is 2029-05-07.
Market and operating context
- Queue date
- 2025-06-12
- Proposed COD
- 2029-05-07
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.