Briefing/projectactive
KYAN SOLAR is a 102 MW Solar project in California, currently active.
The reported queue phase is C09. Proposed COD is 2027-03-02.
- Queue ID
- CAISO-1260
- Location
- Kern, California
- Technology
- Solar
- Market / region
- CAISO
- Point of interconnection
- Midway-Wheeler Ridge #2 230 kV Line
What stands out
1
KYAN SOLAR is a 102 MW Solar project in California with status active.
2
The reported queue phase is C09; proposed COD is 2027-03-02.
Market and operating context
- Queue date
- 2016-05-02
- Proposed COD
- 2027-03-02
- IA status
- IA Executed
- Study phase
- C09
- Service type
- ERIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.