Query
Kuy Creek Storage 1 SLF
Type
Entity Briefing
Entity
Kuy Creek Storage 1 SLF
Generated
2026-10-19T14:18:29.661Z

Briefing on Kuy Creek Storage 1 SLF

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
151 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2029-03-20
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Kuy Creek Storage 1 SLF is a 151 MW Solar+Battery project in Texas, currently active.

Kuy Creek Storage 1 LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-03-20.

Queue ID
ERCOT-28INR0304
Location
Goliad, Texas
Technology
Solar+Battery
Developer
Kuy Creek Storage 1 LLC
Market / region
ERCOT
Point of interconnection
Tap - Coleto Creek (Bus # 8162) - Victoria (Bus# 8172) 138 kV CKT 1

What stands out

1

Kuy Creek Storage 1 SLF is a 151 MW Solar+Battery project in Texas with status active.

2

Kuy Creek Storage 1 LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-03-20.

4

Latest linked story: “LG&E, KU Propose $3.7B Power Buildout: 1.3 GW of New Gas Plants, $153M Coal Unit Upgrade” (POWER Magazine, 2025-03-04).

Market and operating context

Queue date
2025-03-24
Proposed COD
2029-03-20
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Kuy Creek Storage 1 SLF — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0304
LocationGoliad, Texas
TechnologySolar+Battery
DeveloperKuy Creek Storage 1 LLC
Market / regionERCOT
Point of interconnectionTap - Coleto Creek (Bus # 8162) - Victoria (Bus# 8172) 138 kV CKT 1
Queue date2025-03-24
Proposed COD2029-03-20