Kuy Creek Storage 1 SLF is a 151 MW Solar+Battery project in Texas, currently active.
Kuy Creek Storage 1 LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-03-20.
- Queue ID
- ERCOT-28INR0304
- Location
- Goliad, Texas
- Technology
- Solar+Battery
- Developer
- Kuy Creek Storage 1 LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap - Coleto Creek (Bus # 8162) - Victoria (Bus# 8172) 138 kV CKT 1
What stands out
Kuy Creek Storage 1 SLF is a 151 MW Solar+Battery project in Texas with status active.
Kuy Creek Storage 1 LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2029-03-20.
Latest linked story: “LG&E, KU Propose $3.7B Power Buildout: 1.3 GW of New Gas Plants, $153M Coal Unit Upgrade” (POWER Magazine, 2025-03-04).
Market and operating context
- Queue date
- 2025-03-24
- Proposed COD
- 2029-03-20
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.