Briefing/projectactive
Kober Solar Farm is a 19 MW Solar project in New Jersey, currently active.
CEP NJ KOBER LAND LLC is the reported developer. The reported queue phase is TC2. Proposed COD is 2022-12-23.
- Queue ID
- PJM-AH1-257
- Location
- Warren, New Jersey
- Technology
- Solar
- Developer
- CEP NJ KOBER LAND LLC
- Market / region
- PJM
- Point of interconnection
- Broadway - Washington 34.5 kV
What stands out
1
Kober Solar Farm is a 19 MW Solar project in New Jersey with status active.
2
CEP NJ KOBER LAND LLC is the reported developer.
3
The reported queue phase is TC2; proposed COD is 2022-12-23.
Market and operating context
- Queue date
- 2025-02-20
- Proposed COD
- 2022-12-23
- IA status
- System Impact Study
- Study phase
- TC2
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.