Query
Knapp BESS
Type
Entity Briefing
Entity
Knapp BESS
State
TN
Technology
battery
Generated
2026-10-19T04:53:18.458Z

Briefing on Knapp BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
10 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Knapp BESS is a 10 MW Batteries asset in ERCOT (Texas), currently Under construction.

Knapp BESS is reported in Texas under GoldenMax Energy Inc. Available operating and financial measures include $1361/kW reported CapEx.

Location
Scurry, Texas
Technology
Batteries
Owner / parent
GoldenMax Energy Inc
Operator
GoldenMax Energy Inc
Grid
ERCOT (Texas)
Plant ID
69226

What stands out

1

Knapp BESS is a 10 MW Batteries asset in Texas with status Under construction.

2

Available financial measures include $1361/kW CapEx.

3

1 linked queue projects represent 10 MW of proposed capacity.

Market and operating context

ISO / market
ERCOT (Texas)
State rank
#229 of 344
National rank
#647 of 994

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Knapp BESS — verified asset snapshot

FieldValue
LocationScurry, Texas
TechnologyBatteries
Owner / parentGoldenMax Energy Inc
OperatorGoldenMax Energy Inc
GridERCOT (Texas)
Plant ID69226
ISO / marketERCOT (Texas)
State rank#229 of 344