Kit Fox Storage is a 154 MW Battery project in Texas, currently active.
Kit Fox Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-07-01.
- Queue ID
- ERCOT-27INR0014
- Location
- Henderson, Texas
- Technology
- Battery
- Developer
- Kit Fox Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- Walton Switch (6899) 138KV
What stands out
Kit Fox Storage is a 154 MW Battery project in Texas with status active.
Kit Fox Storage, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2027-07-01.
Latest linked story: “Wisconsin unveils historic solar farm with battery storage for round-the-clock power” (Fox News, 2025-09-23).
Market and operating context
- Queue date
- 2023-03-13
- Proposed COD
- 2027-07-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.