Kingsley Solar Farm is a 299 MW Batteries asset in CAISO (California), currently Planned.
Kingsley Solar Farm is reported in California under 90FI 8me, LLC. Available operating and financial measures include $1544/kW reported CapEx.
- Location
- Imperial, California
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- 90FI 8me, LLC
- Operator
- 90FI 8me, LLC
- Grid
- CAISO (California)
- Plant ID
- 64634
What stands out
Kingsley Solar Farm is a 299 MW Batteries asset in California with status Planned.
Available financial measures include $1544/kW CapEx.
Latest linked story: “Avantus bags USD 300m for large solar-storage site in California” (Renewables Now, 2025-12-19).
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #31 of 992
- National rank
- #171 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.