Query
KINGSLEY SOLAR FARM
Type
Entity Briefing
Entity
Kingsley Solar Farm
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Kingsley Solar Farm

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

299 MW
Capacity
Planned
Current status
2
Generators
Briefing/plantPlanned

Kingsley Solar Farm is a 299 MW Batteries asset in CAISO (California), currently Planned.

Kingsley Solar Farm is reported in California under 90FI 8me, LLC. Available operating and financial measures include $1544/kW reported CapEx.

Location
Imperial, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
90FI 8me, LLC
Operator
90FI 8me, LLC
Grid
CAISO (California)
Plant ID
64634

What stands out

1

Kingsley Solar Farm is a 299 MW Batteries asset in California with status Planned.

2

Available financial measures include $1544/kW CapEx.

3

Latest linked story: “Avantus bags USD 300m for large solar-storage site in California” (Renewables Now, 2025-12-19).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#31 of 992
National rank
#171 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Kingsley Solar Farm — verified asset snapshot

FieldValue
LocationImperial, California
TechnologyBatteries, Solar Photovoltaic
Owner / parent90FI 8me, LLC
Operator90FI 8me, LLC
GridCAISO (California)
Plant ID64634
ISO / marketCAISO (California)
Balancing authorityCalifornia Independent System Operator