Query
Kingsburg Solar
Type
Entity Briefing
Entity
Kingsburg Solar
Generated
2026-10-12T10:24:13.727Z

Briefing on Kingsburg Solar

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
4 MW
Capacity
Operating
Current status
2013
Operating since
3
Generators
18.5%
Capacity factor
6 GWh
Annual generation
Briefing/plantOperating

Kingsburg Solar is a 4 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Kingsburg Solar is reported in California since 2013 under Altus Power America Management, LLC. Available operating and financial measures include 18.5% capacity factor and 6 GWh annual generation; $3.9/MWh reported energy value.

Location
Tulare, California
Technology
Solar Photovoltaic
Owner / parent
Altus Power America Management, LLC
Operator
Altus Power America Management, LLC
Grid
CAISO (California)
Plant ID
58304

What stands out

1

Kingsburg Solar is a 4 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 18.5% capacity factor and 6 GWh annual generation.

3

Available financial measures include $3.9/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#441 of 992
National rank
#4209 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.