Briefing on Kinenos Solar

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
203 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Kinenos Solar is a 203 MW Solar project in Texas, currently active.

Encino del Sol Energy, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-12-31.

Queue ID
ERCOT-23INR0087
Location
Brooks, Texas
Technology
Solar
Developer
Encino del Sol Energy, LLC
Market / region
ERCOT
Point of interconnection
tap 345kV 8905 North Edinburg - 8455 Lon Hill

What stands out

1

Kinenos Solar is a 203 MW Solar project in Texas with status active.

2

Encino del Sol Energy, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-12-31.

Market and operating context

Queue date
2020-12-22
Proposed COD
2029-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Kinenos Solar — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0087
LocationBrooks, Texas
TechnologySolar
DeveloperEncino del Sol Energy, LLC
Market / regionERCOT
Point of interconnectiontap 345kV 8905 North Edinburg - 8455 Lon Hill
Queue date2020-12-22