Kinenos Solar is a 203 MW Solar project in Texas, currently active.
Encino del Sol Energy, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-12-31.
- Queue ID
- ERCOT-23INR0087
- Location
- Brooks, Texas
- Technology
- Solar
- Developer
- Encino del Sol Energy, LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 345kV 8905 North Edinburg - 8455 Lon Hill
What stands out
1
Kinenos Solar is a 203 MW Solar project in Texas with status active.
2
Encino del Sol Energy, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-12-31.
Market and operating context
- Queue date
- 2020-12-22
- Proposed COD
- 2029-12-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.