Query
KIFER BESS 1
Type
Entity Briefing
Entity
Kifer BESS 1
State
TN
Technology
battery
Generated
2026-10-11T09:32:03.752Z

Briefing on Kifer BESS 1

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
50 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Kifer BESS 1 is a 50 MW Batteries asset in CAISO (California), currently Under construction.

Kifer BESS 1 is reported in California under Kifer Energy Storage, LLC. Available operating and financial measures include $1361/kW reported CapEx.

Location
Santa Clara, California
Technology
Batteries
Owner / parent
Kifer Energy Storage, LLC
Operator
Kifer Energy Storage, LLC
Grid
CAISO (California)
Plant ID
68953

What stands out

1

Kifer BESS 1 is a 50 MW Batteries asset in California with status Under construction.

2

Available financial measures include $1361/kW CapEx.

3

1 linked queue projects represent 50 MW of proposed capacity.

4

Latest linked story: “Ameresco to build California BESS for Silicon Valley Power” (Power Technology, 2023-11-21).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#97 of 202
National rank
#458 of 994

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Kifer BESS 1 — verified asset snapshot

FieldValue
LocationSanta Clara, California
TechnologyBatteries
Owner / parentKifer Energy Storage, LLC
OperatorKifer Energy Storage, LLC
GridCAISO (California)
Plant ID68953
ISO / marketCAISO (California)
Balancing authorityCalifornia Independent System Operator