Briefing/projectactive
Kickstart Energy Storage IV is a 1 MW Battery project in Texas, currently active.
Kickstart Infrastructure LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-09-30.
- Queue ID
- ERCOT-27INR0472
- Location
- Ellis, Texas
- Technology
- Battery
- Developer
- Kickstart Infrastructure LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV #1906 VENUS_S5 to #68091 NAVARRO
What stands out
1
Kickstart Energy Storage IV is a 1 MW Battery project in Texas with status active.
2
Kickstart Infrastructure LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-09-30.
Market and operating context
- Queue date
- 2025-03-24
- Proposed COD
- 2029-09-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.