Briefing on Kickstart Energy Storage III

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
1 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-09-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Kickstart Energy Storage III is a 1 MW Battery project in Texas, currently active.

Kickstart Infrastructure LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-09-30.

Queue ID
ERCOT-27INR0471
Location
Ellis, Texas
Technology
Battery
Developer
Kickstart Infrastructure LLC
Market / region
ERCOT
Point of interconnection
Tap 345 kV #1906 VENUS_S5 to #68091 NAVARRO

What stands out

1

Kickstart Energy Storage III is a 1 MW Battery project in Texas with status active.

2

Kickstart Infrastructure LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-09-30.

Market and operating context

Queue date
2025-03-24
Proposed COD
2029-09-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Kickstart Energy Storage III — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0471
LocationEllis, Texas
TechnologyBattery
DeveloperKickstart Infrastructure LLC
Market / regionERCOT
Point of interconnectionTap 345 kV #1906 VENUS_S5 to #68091 NAVARRO
Queue date2025-03-24
Proposed COD2029-09-30