Query
KESTREL STORAGE
Type
Entity Briefing
Entity
KESTREL STORAGE
Generated
2026-10-12T01:58:52.725Z

Briefing on KESTREL STORAGE

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
200 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2027-02-28
Proposed COD
C12
Queue phase
Briefing/projectactive

KESTREL STORAGE is a 200 MW Battery project in California, currently active.

The reported queue phase is C12. Proposed COD is 2027-02-28.

Queue ID
CAISO-1615
Location
Los Angeles, California
Technology
Battery
Market / region
CAISO
Point of interconnection
Walnut Substation 220kV

What stands out

1

KESTREL STORAGE is a 200 MW Battery project in California with status active.

2

The reported queue phase is C12; proposed COD is 2027-02-28.

3

Latest linked story: “RWE starts construction of battery storage projects with a combined capacity of 450 MW in the U.S.” (RWE, 2024-10-02).

Market and operating context

Queue date
2019-04-15
Proposed COD
2027-02-28
IA status
IA Executed
Study phase
C12
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

KESTREL STORAGE — verified asset snapshot

FieldValue
Queue IDCAISO-1615
LocationLos Angeles, California
TechnologyBattery
Market / regionCAISO
Point of interconnectionWalnut Substation 220kV
Queue date2019-04-15
Proposed COD2027-02-28
IA statusIA Executed