Kennedy Solar
Type
Entity Briefing
Entity
Kennedy Solar
Generated
2026-10-12T07:57:50.084Z

Briefing on Kennedy Solar

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
102 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Kennedy Solar is a 102 MW Solar+Battery project in Texas, currently active.

Kennedy Bypass Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-31.

Queue ID
ERCOT-24INR0256
Location
Navarro, Texas
Technology
Solar+Battery
Developer
Kennedy Bypass Solar LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 68040 Kopprl Capacitor Yard - 68091 Navarro

What stands out

1

Kennedy Solar is a 102 MW Solar+Battery project in Texas with status active.

2

Kennedy Bypass Solar LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-31.

Market and operating context

Queue date
2022-03-07
Proposed COD
2028-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Kennedy Solar — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0256
LocationNavarro, Texas
TechnologySolar+Battery
DeveloperKennedy Bypass Solar LLC
Market / regionERCOT
Point of interconnectionTap 345kV 68040 Kopprl Capacitor Yard - 68091 Navarro
Queue date2022-03-07
Proposed COD2028-12-31