KCE NY 10, LLC is a 20 MW Batteries asset in NYISO (New York), currently Planned.
KCE NY 10, LLC is reported in New York under Key Capture Energy. Available operating and financial measures include $1361/kW reported CapEx.
- Location
- Erie, New York
- Technology
- Batteries
- Owner / parent
- Key Capture Energy
- Operator
- Key Capture Energy
- Grid
- NYISO (New York)
- Plant ID
- 66682
What stands out
KCE NY 10, LLC is a 20 MW Batteries asset in New York with status Planned.
Available financial measures include $1361/kW CapEx.
1 linked queue projects represent 20 MW of proposed capacity.
Latest linked story: “Key Capture Energy Announces Brian Hayes as New CEO” (Business Wire, 2023-12-07).
Market and operating context
- ISO / market
- NYISO (New York)
- Balancing authority
- New York Independent System Operator
- NERC region
- NPCC
- State rank
- #8 of 53
- National rank
- #530 of 994
Why it matters
For this asset in NYISO (New York), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.