Query
JUNIPERUS BESS
Type
Entity Briefing
Entity
JUNIPERUS BESS
State
TN
Technology
battery
Generated
2026-10-19T08:29:25.793Z

Briefing on JUNIPERUS BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
170 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2029-07-09
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

JUNIPERUS BESS is a 170 MW Solar+Battery project in Texas, currently active.

BLUE STONE RENEWABLE XXI LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-07-09.

Queue ID
ERCOT-27INR0097
Location
Hopkins, Texas
Technology
Solar+Battery
Developer
BLUE STONE RENEWABLE XXI LLC
Market / region
ERCOT
Point of interconnection
TAP CASHSW_T5 (2464) -SULSP_SS1_5 (1697)

What stands out

1

JUNIPERUS BESS is a 170 MW Solar+Battery project in Texas with status active.

2

BLUE STONE RENEWABLE XXI LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-07-09.

Market and operating context

Queue date
2023-10-30
Proposed COD
2029-07-09
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

JUNIPERUS BESS — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0097
LocationHopkins, Texas
TechnologySolar+Battery
DeveloperBLUE STONE RENEWABLE XXI LLC
Market / regionERCOT
Point of interconnectionTAP CASHSW_T5 (2464) -SULSP_SS1_5 (1697)
Queue date2023-10-30
Proposed COD2029-07-09