Briefing on Juniper Ridge BESS 2

Entity Briefing
Generated Aug 29, 2026·Dataset freshness not reported
252 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-06-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Juniper Ridge BESS 2 is a 252 MW Battery project in Texas, currently active.

Lazy U ESS 2 is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-06-30.

Queue ID
ERCOT-26INR0174
Location
Hardeman, Texas
Technology
Battery
Developer
Lazy U ESS 2
Market / region
ERCOT
Point of interconnection
Tap EDITHCLA7B [60505] -- TESLA7A [60501] ckt2

What stands out

1

Juniper Ridge BESS 2 is a 252 MW Battery project in Texas with status active.

2

Lazy U ESS 2 is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-06-30.

Market and operating context

Queue date
2023-08-21
Proposed COD
2029-06-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Juniper Ridge BESS 2 — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0174
LocationHardeman, Texas
TechnologyBattery
DeveloperLazy U ESS 2
Market / regionERCOT
Point of interconnectionTap EDITHCLA7B [60505] -- TESLA7A [60501] ckt2
Queue date2023-08-21
Proposed COD2029-06-30