Juniper Ridge BESS 2 is a 252 MW Battery project in Texas, currently active.
Lazy U ESS 2 is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-06-30.
- Queue ID
- ERCOT-26INR0174
- Location
- Hardeman, Texas
- Technology
- Battery
- Developer
- Lazy U ESS 2
- Market / region
- ERCOT
- Point of interconnection
- Tap EDITHCLA7B [60505] -- TESLA7A [60501] ckt2
What stands out
1
Juniper Ridge BESS 2 is a 252 MW Battery project in Texas with status active.
2
Lazy U ESS 2 is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-06-30.
Market and operating context
- Queue date
- 2023-08-21
- Proposed COD
- 2029-06-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.