Judkins BESS is a 10 MW Batteries asset in ERCOT (Texas), currently Operating.
Judkins BESS is reported in Texas since 2024 under Hunt Energy. Available operating and financial measures include -0.2% capacity factor and -0 GWh annual generation; $1361/kW reported CapEx.
- Location
- Ector, Texas
- Technology
- Batteries
- Owner / parent
- Hunt Energy
- Operator
- HEN Infrastructure, L.L.C.
- Grid
- ERCOT (Texas)
- Plant ID
- 66790
What stands out
Judkins BESS is a 10 MW Batteries asset in Texas with status Operating.
Latest annual operating measures report -0.2% capacity factor and -0 GWh annual generation.
Available financial measures include $1361/kW CapEx.
Latest linked story: “Aypa Power, Hunt Energy Network raise US$573 million for US BESS projects” (Energy-Storage.News, 2024-08-09).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #272 of 344
- National rank
- #743 of 994
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.