Query
Jordanelle Dam Hydroelectric Project
Type
Entity Briefing
Entity
Jordanelle Dam Hydroelectric Project
Technology
hydro
Generated
2026-10-18T01:43:16.967Z

Briefing on Jordanelle Dam Hydroelectric Project

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
13 MW
Capacity
Operating
Current status
2008
Operating since
2
Generators
44.6%
Capacity factor
51 GWh
Annual generation
Briefing/plantOperating

Jordanelle Dam Hydroelectric Project is a 13 MW Conventional Hydroelectric asset in Utah, currently Operating.

Jordanelle Dam Hydroelectric Project is reported in Utah since 2008 under Central Utah Water Conservancy District. Available operating and financial measures include 44.6% capacity factor and 51 GWh annual generation; $2294/kW reported CapEx.

Location
Wasatch, Utah
Technology
Conventional Hydroelectric
Owner / parent
Central Utah Water Conservancy District
Operator
Central Utah Water Conservancy District
Grid
PacifiCorp - East
Plant ID
61853

What stands out

1

Jordanelle Dam Hydroelectric Project is a 13 MW Conventional Hydroelectric asset in Utah with status Operating.

2

Latest annual operating measures report 44.6% capacity factor and 51 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

4

Latest linked story: “Thirsty? Tour highlights Central Utah Water projects” (Deseret News, 2014-09-04).

Market and operating context

Balancing authority
PacifiCorp - East
NERC region
WECC
State rank
#4 of 30
National rank
#583 of 1,462

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.