Briefing/projectactive
Jolly Rock Storage Center is a 209 MW Battery project in Texas, currently active.
Jolly Rock Storage Center LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-05-16.
- Queue ID
- ERCOT-29INR0084
- Location
- Young, Texas
- Technology
- Battery
- Developer
- Jolly Rock Storage Center LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 1431 GRAHAM Plant Switch - 11525 Short Grass Circuit 1.
What stands out
1
Jolly Rock Storage Center is a 209 MW Battery project in Texas with status active.
2
Jolly Rock Storage Center LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-05-16.
Market and operating context
- Queue date
- 2024-12-19
- Proposed COD
- 2029-05-16
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.