Query
Jersey Valley Geothermal Power Plant
Type
Entity Briefing
Entity
Jersey Valley Geothermal Power Plant
State
NJ
Technology
geothermal
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Jersey Valley Geothermal Power Plant

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

24 MW
Capacity
Operating
Current status
2010
Operating since
2
Generators
29.5%
Capacity factor
61 GWh
Annual generation
Briefing/plantOperating

Jersey Valley Geothermal Power Plant is a 24 MW Geothermal asset in Nevada, currently Operating.

Jersey Valley Geothermal Power Plant is reported in Nevada since 2010 under Ormat Nevada Inc. Available operating and financial measures include 29.5% capacity factor and 61 GWh annual generation; $2851/kW reported CapEx.

Location
Pershing, Nevada
Technology
Geothermal
Owner / parent
Ormat Nevada Inc
Operator
Ormat Nevada Inc
Grid
Nevada Power Company
Plant ID
57376

What stands out

1

Jersey Valley Geothermal Power Plant is a 24 MW Geothermal asset in Nevada with status Operating.

2

Latest annual operating measures report 29.5% capacity factor and 61 GWh annual generation.

3

Available financial measures include $2851/kW CapEx.

4

Latest linked story: “Clean energy goes up against tribal rights and biodiversity in Nevada” (Grist, 2022-01-07).

Market and operating context

Balancing authority
Nevada Power Company
NERC region
WECC
State rank
#21 of 27
National rank
#50 of 69

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.