Jefferson Torresdale Hospital is a 1 MW Natural Gas Internal Combustion Engine asset in PJM Interconnection, currently Standby.
Jefferson Torresdale Hospital is reported in Pennsylvania since 2016 under Jefferson Torresdale Hospital. Available operating and financial measures include 27.1% capacity factor and 3 GWh annual generation; $895/kW reported CapEx.
- Location
- Philadelphia, Pennsylvania
- Technology
- Natural Gas Internal Combustion Engine
- Owner / parent
- Jefferson Torresdale Hospital
- Operator
- Jefferson Torresdale Hospital
- Grid
- PJM Interconnection
- Plant ID
- 63023
What stands out
Jefferson Torresdale Hospital is a 1 MW Natural Gas Internal Combustion Engine asset in Pennsylvania with status Standby.
Latest annual operating measures report 27.1% capacity factor and 3 GWh annual generation.
Available financial measures include $895/kW CapEx.
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #69 of 70
- National rank
- #1986 of 2,025
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.