Jayhawk Wind Energy Center is a 197 MW Onshore Wind Turbine asset in SPP (Southwest Power Pool), currently Operating.
Jayhawk Wind Energy Center is reported in Kansas since 2022 under WEC Energy Group. Available operating and financial measures include 32.1% capacity factor and 556 GWh annual generation; $1686/kW reported CapEx.
- Location
- Crawford, Kansas
- Technology
- Onshore Wind Turbine
- Owner / parent
- WEC Energy Group
- Operator
- Invenergy Services LLC
- Grid
- SPP (Southwest Power Pool)
- Plant ID
- 65129
What stands out
Jayhawk Wind Energy Center is a 197 MW Onshore Wind Turbine asset in Kansas with status Operating.
Latest annual operating measures report 32.1% capacity factor and 556 GWh annual generation.
Available financial measures include $1686/kW CapEx.
Latest linked story: “WEC Energy Group to acquire majority interest in Jayhawk Wind Farm” (Power Technology, 2021-03-02).
Market and operating context
- ISO / market
- SPP (Southwest Power Pool)
- Balancing authority
- Southwest Power Pool
- NERC region
- MRO
- State rank
- #28 of 53
- National rank
- #389 of 1,442
Why it matters
For this asset in SPP (Southwest Power Pool), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.