259 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-02-13
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Jay Flat BESS is a 259 MW Battery project in Texas, currently active.

Jay Flat BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-02-13.

Queue ID
ERCOT-27INR0447
Location
Kent, Texas
Technology
Battery
Developer
Jay Flat BESS LLC
Market / region
ERCOT
Point of interconnection
59908 Novaprime 345kV

What stands out

1

Jay Flat BESS is a 259 MW Battery project in Texas with status active.

2

Jay Flat BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-02-13.

Market and operating context

Queue date
2025-01-28
Proposed COD
2029-02-13
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Jay Flat BESS — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0447
LocationKent, Texas
TechnologyBattery
DeveloperJay Flat BESS LLC
Market / regionERCOT
Point of interconnection59908 Novaprime 345kV
Queue date2025-01-28
Proposed COD2029-02-13