Briefing on Jawbone Wind Project

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

80 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Jawbone Wind Project is a 80 MW Onshore Wind Turbine asset in Montana, currently Under construction.

Jawbone Wind Project is reported in Montana under Triple Oak Power LLC. Available operating and financial measures include $2114/kW reported CapEx.

Location
Wheatland, Montana
Technology
Onshore Wind Turbine
Owner / parent
Triple Oak Power LLC
Operator
Triple Oak Power LLC
Grid
NorthWestern Energy (NWMT)
Plant ID
58175

What stands out

1

Jawbone Wind Project is a 80 MW Onshore Wind Turbine asset in Montana with status Under construction.

2

Available financial measures include $2114/kW CapEx.

3

Latest linked story: “Seventus chisels Jawbone deal” (reNews - Renewable Energy News, 2018-08-15).

Market and operating context

Balancing authority
NorthWestern Energy (NWMT)
NERC region
WECC
State rank
#13 of 25
National rank
#817 of 1,442

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Jawbone Wind Project — verified asset snapshot

FieldValue
LocationWheatland, Montana
TechnologyOnshore Wind Turbine
Owner / parentTriple Oak Power LLC
OperatorTriple Oak Power LLC
GridNorthWestern Energy (NWMT)
Plant ID58175
Balancing authorityNorthWestern Energy (NWMT)
NERC regionWECC