Jackalope Solar is a 156 MW Solar project in Texas, currently active.
Peacock Energy Project, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-02-05.
- Queue ID
- ERCOT-23INR0180
- Location
- San Patricio, Texas
- Technology
- Solar
- Developer
- Peacock Energy Project, LLC
- Market / region
- ERCOT
- Point of interconnection
- 8173 Gibbs 138kV
What stands out
Jackalope Solar is a 156 MW Solar project in Texas with status active.
Peacock Energy Project, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2026-02-05.
Latest linked story: “10 Power Purchase Agreements signed and 1.3GW contracted in 2024” (Lightsource bp, 2025-02-19).
Market and operating context
- Queue date
- 2021-02-09
- Proposed COD
- 2026-02-05
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.