Query
J C McNeil
Type
Entity Briefing
Entity
J C McNeil
Generated
2026-10-13T15:56:17.235Z

Briefing on J C McNeil

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
60 MW
Capacity
Operating
Current status
1984
Operating since
1
Generators
40.2%
Capacity factor
209 GWh
Annual generation
Briefing/plantOperating

J C McNeil is a 60 MW Wood/Wood Waste Biomass asset in ISO New England, currently Operating.

J C McNeil is reported in Vermont since 1984 under Burlington Electric Department. Available operating and financial measures include 40.2% capacity factor and 209 GWh annual generation; $2025/kW reported CapEx.

Location
Chittenden, Vermont
Technology
Wood/Wood Waste Biomass
Owner / parent
Burlington Electric Department
Operator
City of Burlington Electric - (VT)
Grid
ISO New England
Plant ID
589

What stands out

1

J C McNeil is a 60 MW Wood/Wood Waste Biomass asset in Vermont with status Operating.

2

Latest annual operating measures report 40.2% capacity factor and 209 GWh annual generation.

3

Available financial measures include $120.0/MWh OpEx, $2025/kW CapEx.

4

Latest linked story: “Burlington's greenhouse gas emissions are down 19% since 2018: New energy incentives begin” (Burlington Free Press, 2025-04-11).

Market and operating context

ISO / market
ISO New England
Balancing authority
ISO New England Inc.
NERC region
NPCC
State rank
#1 of 3
National rank
#21 of 104

Why it matters

For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.