Briefing on Indigo solar 2

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
180 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-07-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Indigo solar 2 is a 180 MW Solar+Battery project in Texas, currently active.

Indigo Solar 2 is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-07-15.

Queue ID
ERCOT-25INR0547
Location
Fisher, Texas
Technology
Solar+Battery
Developer
Indigo Solar 2
Market / region
ERCOT
Point of interconnection
Tap 345KV 68001 Clayton 345KV -68000 WShack Ckt 2

What stands out

1

Indigo solar 2 is a 180 MW Solar+Battery project in Texas with status active.

2

Indigo Solar 2 is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-07-15.

Market and operating context

Queue date
2023-10-04
Proposed COD
2027-07-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Indigo solar 2 — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0547
LocationFisher, Texas
TechnologySolar+Battery
DeveloperIndigo Solar 2
Market / regionERCOT
Point of interconnectionTap 345KV 68001 Clayton 345KV -68000 WShack Ckt 2
Queue date2023-10-04
Proposed COD2027-07-15