Query
Independence Trail Storage
Type
Entity Briefing
Entity
Independence Trail Storage
Generated
2026-10-20T03:56:36.129Z

Briefing on Independence Trail Storage

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
100 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-01-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Independence Trail Storage is a 100 MW Battery project in Texas, currently active.

KCE TX 16, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-01-01.

Queue ID
ERCOT-21INR0455
Location
Childress, Texas
Technology
Battery
Developer
KCE TX 16, LLC
Market / region
ERCOT
Point of interconnection
60501 Tesla 345kV

What stands out

1

Independence Trail Storage is a 100 MW Battery project in Texas with status active.

2

KCE TX 16, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-01-01.

Market and operating context

Queue date
2019-12-03
Proposed COD
2028-01-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Independence Trail Storage — verified asset snapshot

FieldValue
Queue IDERCOT-21INR0455
LocationChildress, Texas
TechnologyBattery
DeveloperKCE TX 16, LLC
Market / regionERCOT
Point of interconnection60501 Tesla 345kV
Queue date2019-12-03
Proposed COD2028-01-01