Briefing/projectactive
Inadale Solar is a 281 MW Solar+Battery project in Texas, currently active.
Inadale Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-25.
- Queue ID
- ERCOT-25INR0196
- Location
- Scurry, Texas
- Technology
- Solar+Battery
- Developer
- Inadale Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV TONKAWAW_5 (11048) – SCURCNTYS_5 (11318) Circuit #2
What stands out
1
Inadale Solar is a 281 MW Solar+Battery project in Texas with status active.
2
Inadale Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-07-25.
Market and operating context
- Queue date
- 2023-02-20
- Proposed COD
- 2028-07-25
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.