Inadale BESS is a 287 MW Solar+Battery project in Texas, currently active.
Inadale BESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-25.
- Queue ID
- ERCOT-25INR0197
- Location
- Scurry, Texas
- Technology
- Solar+Battery
- Developer
- Inadale BESS, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV TONKAWAW_5 (11048) – SCURCNTYS_5 (11318) Circuit #2
What stands out
Inadale BESS is a 287 MW Solar+Battery project in Texas with status active.
Inadale BESS, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-07-25.
Latest linked story: “RWE co-located battery storage facility comes online in Texas as the State breaks power demand records” (RWE, 2023-08-24).
Market and operating context
- Queue date
- 2023-02-20
- Proposed COD
- 2028-07-25
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.