Briefing on IEP Orchard BESS

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
10 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2026-09-18
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

IEP Orchard BESS is a 10 MW Battery project in Texas, currently active.

IEP Tejas Verde LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-09-18.

Queue ID
ERCOT-23INR0556
Location
Fort Bend, Texas
Technology
Battery
Developer
IEP Tejas Verde LLC
Market / region
ERCOT
Point of interconnection
Station Name (TDSP Station Code): OR Load/Load Transformer Name :TR1 PTI BUS number: 44541 Voltage in kV (Transmission Level): 138 kV Project Size: 9.99 MW battery energy storage (BESS) system; 50 MWh connecting on CNP 34.5kV Distribution System.

What stands out

1

IEP Orchard BESS is a 10 MW Battery project in Texas with status active.

2

IEP Tejas Verde LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-09-18.

Market and operating context

Proposed COD
2026-09-18
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

IEP Orchard BESS — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0556
LocationFort Bend, Texas
TechnologyBattery
DeveloperIEP Tejas Verde LLC
Market / regionERCOT
Point of interconnectionStation Name (TDSP Station Code): OR Load/Load Transformer Name :TR1 PTI BUS number: 44541 Voltage in kV (Transmission Level): 138 kV Project Size: 9.99 MW battery energy storage (BESS) system; 50 MWh connecting on CNP 34.5kV Distribution System.
Proposed COD2026-09-18
IA statusIA Executed