IEP Orchard BESS is a 10 MW Battery project in Texas, currently active.
IEP Tejas Verde LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-09-18.
- Queue ID
- ERCOT-23INR0556
- Location
- Fort Bend, Texas
- Technology
- Battery
- Developer
- IEP Tejas Verde LLC
- Market / region
- ERCOT
- Point of interconnection
- Station Name (TDSP Station Code): OR Load/Load Transformer Name :TR1 PTI BUS number: 44541 Voltage in kV (Transmission Level): 138 kV Project Size: 9.99 MW battery energy storage (BESS) system; 50 MWh connecting on CNP 34.5kV Distribution System.
What stands out
1
IEP Orchard BESS is a 10 MW Battery project in Texas with status active.
2
IEP Tejas Verde LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-09-18.
Market and operating context
- Proposed COD
- 2026-09-18
- IA status
- IA Executed
- Study phase
- IA Executed