Briefing/plantOperating
I 95 Landfill Phase II is a 3 MW Landfill Gas asset in PJM Interconnection, currently Operating.
I 95 Landfill Phase II is reported in Virginia since 1993 under EQT. Available operating and financial measures include 68.8% capacity factor and 19 GWh annual generation; $3495/kW reported CapEx.
- Location
- Fairfax, Virginia
- Technology
- Landfill Gas
- Owner / parent
- EQT
- Operator
- NextEra Renewable Fuels, LLC
- Grid
- PJM Interconnection
- Plant ID
- 54723
What stands out
1
I 95 Landfill Phase II is a 3 MW Landfill Gas asset in Virginia with status Operating.
2
Latest annual operating measures report 68.8% capacity factor and 19 GWh annual generation.
3
Available financial measures include $3495/kW CapEx.
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- SERC
- State rank
- #11 of 13
- National rank
- #180 of 282
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.