Briefing on I 95 Landfill Phase II

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
3 MW
Capacity
Operating
Current status
1993
Operating since
4
Generators
68.8%
Capacity factor
19 GWh
Annual generation
Briefing/plantOperating

I 95 Landfill Phase II is a 3 MW Landfill Gas asset in PJM Interconnection, currently Operating.

I 95 Landfill Phase II is reported in Virginia since 1993 under EQT. Available operating and financial measures include 68.8% capacity factor and 19 GWh annual generation; $3495/kW reported CapEx.

Location
Fairfax, Virginia
Technology
Landfill Gas
Owner / parent
EQT
Operator
NextEra Renewable Fuels, LLC
Grid
PJM Interconnection
Plant ID
54723

What stands out

1

I 95 Landfill Phase II is a 3 MW Landfill Gas asset in Virginia with status Operating.

2

Latest annual operating measures report 68.8% capacity factor and 19 GWh annual generation.

3

Available financial measures include $3495/kW CapEx.

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
SERC
State rank
#11 of 13
National rank
#180 of 282

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.