Query
HUMIDOR STORAGE 1
Type
Entity Briefing
Entity
HUMIDOR STORAGE 1
Generated
2026-10-10T18:07:06.601Z

Briefing on HUMIDOR STORAGE 1

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
305 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2028-10-01
Proposed COD
C12
Queue phase
Briefing/projectactive

HUMIDOR STORAGE 1 is a 305 MW Battery project in California, currently active.

The reported queue phase is C12. Proposed COD is 2028-10-01.

Queue ID
CAISO-1629
Location
Los Angeles, California
Technology
Battery
Market / region
CAISO
Point of interconnection
Vincent Substation 230 kV

What stands out

1

HUMIDOR STORAGE 1 is a 305 MW Battery project in California with status active.

2

The reported queue phase is C12; proposed COD is 2028-10-01.

3

Latest linked story: “Acton gains backing vs. battery storage” (avpress.com, 2026-01-09).

Market and operating context

Queue date
2019-04-15
Proposed COD
2028-10-01
IA status
IA Executed
Study phase
C12
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

HUMIDOR STORAGE 1 — verified asset snapshot

FieldValue
Queue IDCAISO-1629
LocationLos Angeles, California
TechnologyBattery
Market / regionCAISO
Point of interconnectionVincent Substation 230 kV
Queue date2019-04-15
Proposed COD2028-10-01
IA statusIA Executed