Query
Hudson - High Desert Hybrid
Type
Entity Briefing
Entity
Hudson - High Desert Hybrid
State
MI
Generated
2026-10-18T00:31:28.750Z

Briefing on Hudson - High Desert Hybrid

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
150 MW
Capacity
Operating
Current status
2021
Operating since
2
Generators
22.0%
Capacity factor
289 GWh
Annual generation
Briefing/plantOperating

Hudson - High Desert Hybrid is a 150 MW Batteries asset in CAISO (California), currently Operating.

Hudson - High Desert Hybrid is reported in California since 2021 under MN8 Energy LLC. Available operating and financial measures include 22.0% capacity factor and 289 GWh annual generation; $10.9/MWh reported energy value.

Location
San Bernardino, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
MN8 Energy LLC
Operator
MN8 Energy LLC
Grid
CAISO (California)
Plant ID
64624

What stands out

1

Hudson - High Desert Hybrid is a 150 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 22.0% capacity factor and 289 GWh annual generation.

3

Available financial measures include $10.9/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#84 of 992
National rank
#577 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.