Query
Hubbard Wind II
Type
Entity Briefing
Entity
Hubbard Wind II
Technology
wind
Generated
2026-09-18T21:26:30.344Z

Briefing on Hubbard Wind II

Entity Briefing
Generated Sep 18, 2026·Dataset freshness not reported
305 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Hubbard Wind II is a 305 MW Onshore Wind Turbine asset in ERCOT (Texas), currently Under construction.

Hubbard Wind II is reported in Texas under Hubbard Wind II, LLC. Available operating and financial measures include $1468/kW reported CapEx.

Location
Hill, Texas
Technology
Onshore Wind Turbine
Owner / parent
Hubbard Wind II, LLC
Operator
Hubbard Wind II, LLC
Grid
ERCOT (Texas)
Plant ID
69010

What stands out

1

Hubbard Wind II is a 305 MW Onshore Wind Turbine asset in Texas with status Under construction.

2

Available financial measures include $1468/kW CapEx.

3

Latest linked story: “Second Hubbard Wind project draws opposition” (The Lakelander, 2024-02-01).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#23 of 252
National rank
#78 of 1,442

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Hubbard Wind II — verified asset snapshot

FieldValue
LocationHill, Texas
TechnologyOnshore Wind Turbine
Owner / parentHubbard Wind II, LLC
OperatorHubbard Wind II, LLC
GridERCOT (Texas)
Plant ID69010
ISO / marketERCOT (Texas)
Balancing authorityElectric Reliability Council of Texas, Inc.