Briefing/projectactive
Howard Road BESS is a 618 MW Battery project in Texas, currently active.
Project Fast Flow LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-01.
- Queue ID
- ERCOT-29INR0173
- Location
- Bexar, Texas
- Technology
- Battery
- Developer
- Project Fast Flow LLC
- Market / region
- ERCOT
- Point of interconnection
- BUS#5231 HOWARD RD 345 kV SUBSTATION
What stands out
1
Howard Road BESS is a 618 MW Battery project in Texas with status active.
2
Project Fast Flow LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-04-01.
Market and operating context
- Queue date
- 2025-07-29
- Proposed COD
- 2028-04-01
- IA status
- Facility Study
- Study phase
- Facility Study