Query
Howard Road BESS
Type
Entity Briefing
Entity
Howard Road BESS
State
CO
Technology
battery
Generated
2026-10-06T18:56:24.382Z

Briefing on Howard Road BESS

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
618 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-04-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Howard Road BESS is a 618 MW Battery project in Texas, currently active.

Project Fast Flow LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-01.

Queue ID
ERCOT-29INR0173
Location
Bexar, Texas
Technology
Battery
Developer
Project Fast Flow LLC
Market / region
ERCOT
Point of interconnection
BUS#5231 HOWARD RD 345 kV SUBSTATION

What stands out

1

Howard Road BESS is a 618 MW Battery project in Texas with status active.

2

Project Fast Flow LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-04-01.

Market and operating context

Queue date
2025-07-29
Proposed COD
2028-04-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Howard Road BESS — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0173
LocationBexar, Texas
TechnologyBattery
DeveloperProject Fast Flow LLC
Market / regionERCOT
Point of interconnectionBUS#5231 HOWARD RD 345 kV SUBSTATION
Queue date2025-07-29
Proposed COD2028-04-01