Query
Houston IV BESS
Type
Entity Briefing
Entity
Houston IV BESS
State
TN
Technology
battery
Generated
2026-10-05T12:39:42.989Z

Briefing on Houston IV BESS

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
165 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2026-08-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Houston IV BESS is a 165 MW Battery project in Texas, currently active.

SMT Houston IV LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-08-01.

Queue ID
ERCOT-24INR0584
Location
Harris, Texas
Technology
Battery
Developer
SMT Houston IV LLC
Market / region
ERCOT
Point of interconnection
44140 CLODINE 138kV

What stands out

1

Houston IV BESS is a 165 MW Battery project in Texas with status active.

2

SMT Houston IV LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-08-01.

4

Latest linked story: “Irby Construction, SMT Energy, and CenterPoint Energy Break” (GlobeNewswire, 2025-05-13).

Market and operating context

Queue date
2023-07-10
Proposed COD
2026-08-01
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Houston IV BESS — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0584
LocationHarris, Texas
TechnologyBattery
DeveloperSMT Houston IV LLC
Market / regionERCOT
Point of interconnection44140 CLODINE 138kV
Queue date2023-07-10
Proposed COD2026-08-01