Briefing/projectactive
Houston IV BESS is a 165 MW Battery project in Texas, currently active.
SMT Houston IV LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-08-01.
- Queue ID
- ERCOT-24INR0584
- Location
- Harris, Texas
- Technology
- Battery
- Developer
- SMT Houston IV LLC
- Market / region
- ERCOT
- Point of interconnection
- 44140 CLODINE 138kV
What stands out
1
Houston IV BESS is a 165 MW Battery project in Texas with status active.
2
SMT Houston IV LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-08-01.
4
Latest linked story: “Irby Construction, SMT Energy, and CenterPoint Energy Break” (GlobeNewswire, 2025-05-13).
Market and operating context
- Queue date
- 2023-07-10
- Proposed COD
- 2026-08-01
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.