Briefing on Hopewell Cogeneration

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

399 MW
Capacity
Operating
Current status
1990
Operating since
4
Generators
55.4%
Capacity factor
1773 GWh
Annual generation
Briefing/plantOperating

Hopewell Cogeneration is a 399 MW Natural Gas Fired Combined Cycle asset in PJM Interconnection, currently Operating.

Hopewell Cogeneration is reported in Virginia since 1990 under Vistra. Available operating and financial measures include 55.4% capacity factor and 1773 GWh annual generation; $965/kW reported CapEx.

Location
Prince George, Virginia
Technology
Natural Gas Fired Combined Cycle
Owner / parent
Vistra
Operator
Luminant Generation Company LLC
Grid
PJM Interconnection
Plant ID
10633

What stands out

1

Hopewell Cogeneration is a 399 MW Natural Gas Fired Combined Cycle asset in Virginia with status Operating.

2

Latest annual operating measures report 55.4% capacity factor and 1773 GWh annual generation.

3

Available financial measures include $965/kW CapEx.

4

Latest linked story: “Emissions from three plants in Virginia identified as cancer-causing hotspots” (VPM, 2022-02-13).

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
SERC
State rank
#16 of 30
National rank
#568 of 2,025

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.