Hopewell Cogeneration is a 399 MW Natural Gas Fired Combined Cycle asset in PJM Interconnection, currently Operating.
Hopewell Cogeneration is reported in Virginia since 1990 under Vistra. Available operating and financial measures include 55.4% capacity factor and 1773 GWh annual generation; $965/kW reported CapEx.
- Location
- Prince George, Virginia
- Technology
- Natural Gas Fired Combined Cycle
- Owner / parent
- Vistra
- Operator
- Luminant Generation Company LLC
- Grid
- PJM Interconnection
- Plant ID
- 10633
What stands out
Hopewell Cogeneration is a 399 MW Natural Gas Fired Combined Cycle asset in Virginia with status Operating.
Latest annual operating measures report 55.4% capacity factor and 1773 GWh annual generation.
Available financial measures include $965/kW CapEx.
Latest linked story: “Emissions from three plants in Virginia identified as cancer-causing hotspots” (VPM, 2022-02-13).
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- SERC
- State rank
- #16 of 30
- National rank
- #568 of 2,025
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.