Hoot Lake Solar is a 50 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Operating.
Hoot Lake Solar is reported in Minnesota since 2023 under Otter Tail. Available operating and financial measures include 16.7% capacity factor and 73 GWh annual generation; $1254/kW reported CapEx.
- Location
- Otter Tail, Minnesota
- Technology
- Solar Photovoltaic
- Owner / parent
- Otter Tail
- Operator
- Otter Tail Power Co
- Grid
- MISO (Midcontinent)
- Plant ID
- 65066
What stands out
Hoot Lake Solar is a 50 MW Solar Photovoltaic asset in Minnesota with status Operating.
Latest annual operating measures report 16.7% capacity factor and 73 GWh annual generation.
Available financial measures include $8093.2/MWh OpEx, $1254/kW CapEx.
Latest linked story: “Otter Tail Power Company completes Hoot Lake Solar” (Fergus Now, 2023-08-10).
Market and operating context
- ISO / market
- MISO (Midcontinent)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
- State rank
- #8 of 549
- National rank
- #1468 of 7,971
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.