Query
Hollister Wastewater Facility
Type
Entity Briefing
Entity
Hollister Wastewater Facility
Generated
2026-10-17T11:16:17.474Z

Briefing on Hollister Wastewater Facility

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
1 MW
Capacity
Operating
Current status
2011
Operating since
1
Generators
18.8%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

Hollister Wastewater Facility is a 1 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Hollister Wastewater Facility is reported in California since 2011 under SunStrong Management, LLC. Available operating and financial measures include 18.8% capacity factor and 2 GWh annual generation; $37.8/MWh reported energy value.

Location
San Benito, California
Technology
Solar Photovoltaic
Owner / parent
SunStrong Management, LLC
Operator
SunStrong Management, LLC
Grid
CAISO (California)
Plant ID
68016

What stands out

1

Hollister Wastewater Facility is a 1 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 18.8% capacity factor and 2 GWh annual generation.

3

Available financial measures include $37.8/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#962 of 992
National rank
#7420 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.