Query
HMV Minster Energy Storage System
Type
Entity Briefing
Entity
HMV Minster Energy Storage System
Technology
battery
Generated
2026-10-17T07:29:08.972Z

Briefing on HMV Minster Energy Storage System

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
7 MW
Capacity
Out of service
Current status
2016
Operating since
1
Generators
0.0%
Capacity factor
0 GWh
Annual generation
Briefing/plantOut of service

HMV Minster Energy Storage System is a 7 MW Batteries asset in PJM Interconnection, currently Out of service.

HMV Minster Energy Storage System is reported in Ohio since 2016 under Summit Ridge Energy. Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $1763/kW reported CapEx.

Location
Auglaize, Ohio
Technology
Batteries
Owner / parent
Summit Ridge Energy
Operator
Summit Ridge Energy
Grid
PJM Interconnection
Plant ID
60299

What stands out

1

HMV Minster Energy Storage System is a 7 MW Batteries asset in Ohio with status Out of service.

2

Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.

3

Available financial measures include $1763/kW CapEx.

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
State rank
#6 of 7
National rank
#788 of 994

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.