Highland Park Borough Solar is a 1 MW Batteries asset in PJM Interconnection, currently Operating.
Highland Park Borough Solar is reported in New Jersey since 2019 under Public Service Elec & Gas Co. Available operating and financial measures include 6.6% capacity factor and 1 GWh annual generation; $2544/kW reported CapEx.
- Location
- Middlesex, New Jersey
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Public Service Elec & Gas Co
- Operator
- Public Service Elec & Gas Co
- Grid
- PJM Interconnection
- Plant ID
- 65468
What stands out
Highland Park Borough Solar is a 1 MW Batteries asset in New Jersey with status Operating.
Latest annual operating measures report 6.6% capacity factor and 1 GWh annual generation.
Available financial measures include $2544/kW CapEx.
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #9 of 10
- National rank
- #975 of 994
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.