Briefing on High Springs Solar Power Plant

Entity Briefing

Summary generated Oct 9, 2026 (UTC).

Source dates used by this summary were not recorded.

75 MW
Capacity
Operating
Current status
2023
Operating since
1
Generators
25.1%
Capacity factor
165 GWh
Annual generation
Briefing/plantOperating

High Springs Solar Power Plant is a 75 MW Solar Photovoltaic asset in Florida, currently Operating.

High Springs Solar Power Plant is reported in Florida since 2023 under Duke Energy. Available operating and financial measures include 25.1% capacity factor and 165 GWh annual generation.

Location
Alachua, Florida
Technology
Solar Photovoltaic
Owner / parent
Duke Energy
Operator
Duke Energy Florida, LLC
Grid
Duke Energy Florida Inc
Plant ID
65172

What stands out

1

High Springs Solar Power Plant is a 75 MW Solar Photovoltaic asset in Florida with status Operating.

2

Latest annual operating measures report 25.1% capacity factor and 165 GWh annual generation.

3

Latest linked story: “A dark side to solar installations” (Mid Florida Newspapers, 2026-04-08).

Market and operating context

Balancing authority
Duke Energy Florida Inc
NERC region
SERC
State rank
#30 of 237
National rank
#1088 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.