Briefing on Sonora High Noon BESS

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
204 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-07-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Sonora High Noon BESS is a 204 MW Battery project in Texas, currently active.

Sonora High Noon, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-01.

Queue ID
ERCOT-28INR0148
Location
Sutton, Texas
Technology
Battery
Developer
Sonora High Noon, LLC
Market / region
ERCOT
Point of interconnection
60412 CARVER 138kV

What stands out

1

Sonora High Noon BESS is a 204 MW Battery project in Texas with status active.

2

Sonora High Noon, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-07-01.

Market and operating context

Queue date
2024-09-04
Proposed COD
2028-07-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Sonora High Noon BESS — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0148
LocationSutton, Texas
TechnologyBattery
DeveloperSonora High Noon, LLC
Market / regionERCOT
Point of interconnection60412 CARVER 138kV
Queue date2024-09-04